Tianjin Yuantai Derun Pipe Manufacturing Group Co., Ltd., established in March 2002, is the biggest manufacturer specializing in  ERW square&rectangular tube/pipe, hollow section structure pipe, galvanized pipe and spiral welding pipe in China. Annual output reaches 5 million tons.Yuantai Derun has 59 production lines of black ERW pipe, 10 production lines of galvanized pipe and 3 production lines of spiral welding pipe. Square pipe from 20*20*1mm to 500*500*40mm, rectangular pipe from 20*30*1.2mm to 400*600*40mm,  welded pipe from 2”—60” can be manufactured. Yuantai Derun can manufacture square rectangular pipes as per the standards of ASTM A500, JIS G3466, EN10219, DIN2240, BS1387, AS1163.

Learn More >>
January 1993

Key team members of Yuantai Derun group began technical job in Tianjin Daqiuzhuang tube factory.

June 2002

Tianjin Yuantai Industry & Trade Co., Ltd. was founded, specialize in square, rectangular hollow steel pipe, hot galvanized welded (hot dip galvanized) square tube, the registered capital is USD 10 million.

May 2004

One of Yuantai subsidiaries Tangshan Lituo Steel Tube Co., Ltd. was established, specialize in square rectangular straight welded hollow steel pipe, registered capital is USD 10 million.

April 2005

Yuantai Steel Square Pipe Co. Ltd. was established, specialize in square welding hollow steel tube and galvanized tube, the registered is USD 2 million.

March 2010

Tianjin Yuantai Runxiang commercial trade company was established, specialize in strip steel trade, galvanized pipe agent, etc., the registered capital is USD 2 million.

March 2010

Tianjin Yuantai Derun pipe manufacturing group Co. Ltd. was formally established, marking that the production of high-frequency welded black, galvanized square pipe, spiral welded pipe, pipe logistics and pipe trade as one of the large-scale joint enterprise Yuantai Derun group was formally established, the group registered capital is USD 20 million.

March 2010

Tianjin Yuantai Derun Investment Co., Ltd. was formally established, specialize in steel pipe industry chain,lower industry mergers and acquisitions and industrial real estate development, the registered capital is USD 2 million.

August 2013

Tianjin Derun Runfeng pipe manufacturing Co. Ltd was established, specialize in hot galvanized (hot galvanizing) processing business, the registered capital is USD 8 million.

March 2015

Tianjin Yuantai Yuanda anti-corrosion insulation pipe Co., Ltd. was established, specialize in spiral welded pipe production and sales, the registered capital is USD 2 million.

August 2015

Tangshan Yuantai Derun Pipe Co., Ltd. was established, specialize in steel strip, steel pipe trade, registered capital is USD 1 million.

March 2016

Tianjin Yuantai Derun International Trade Co., Ltd was established,mainly engaged in international import and export business for Yuantai Group, registered capital is USD 2 million.

news

EXCEED EXCELLENT INNOVATION

Integrity

Rely on faith and trust to be achievement, make friends and be on the way all the time.

Innovation

Be low key but ambitious, look forward to the Era of Smart Production with intelligence, information and precision

Development

Create a century brand by the way of forging ahead and pursuing excellence

Dedication

Realize our vision and task, be valuable and feedback.

Detailed explanation of steel pipe piles construction-news-TIANJIN YUANTAI DERUN PIPE MANUFACTURING GROUP CO., LTD-
news

Home >> news

Detailed explanation of steel pipe piles construction
Detailed explanation of steel pipe piles construction

In daily construction sites, we often see steel pipe piles. Steel pipe piles are widely used in automobiles, shipbuilding, and mining machinery because of their simple structure, convenient use, and good sealing. Steel pipe piles are large in size, changeable in shape, and have various interfaces such as circular, square, and rectangular, so they are also used in the construction of aerospace engineering.

Preparations and Precautions

1. Carry out plane positioning according to the design drawings provided by the design unit, and report to the owner and supervisor for approval.

2. Under the witness of the supervisor, the materials used in the project shall be subject to witness sampling and inspection after the appearance and quality assurance acceptance are passed, and they can be used only after passing the inspection.

3. During the construction process, it is necessary to do a good job in site treatment, lofting piles and compounding, etc., and coordinate construction.


steel pipe piles2.jpg


Construction process:

1. Move the pile driver to install the pile driver in place, hang the pile, insert the pile, hammer the sinking pile, hammer the pile to the design depth, cut the steel pipe pile inwards, and press the grouting. It should be noted that in order to prevent large displacement and displacement of adjacent piles and surrounding walls during piling and to facilitate construction, it is generally used to drill the middle first and then the periphery (or first drill the middle and then both sides). This is beneficial to reduce soil extrusion and meet the design requirements for piling depth.

2. Transport the steel pipe piles to the site with a flatbed truck, unload them on the side of the pile machine with a crane, stack them according to the piling sequence and the matching requirements of the piles, and pay attention to the direction. The steel pipe piles are mostly hoisted by one-point lashing. After being hoisted to the pile position, the piles are inserted, and the steel pipe piles are aligned with the sample pile positions marked out with lime in advance so that the pile positions are upright and the pile body is straight.

3. In order to prevent the pile head from being damaged by hammering, a special pile cap is placed on the top of the pile head before piling. Place hardwood shock-absorbing pads on the parts directly subjected to hammering. When piling, correct the verticality of the guide bar of the pile frame and the pile, and keep the hammer, the pile cap, and the pile on the same longitudinal axis, and then drive 1-2 meters in the air, and then start piling after correcting the verticality again. When sinking to a certain depth and the quality of pile sinking is good after review, continue hammering until the pile is 60-80cm above the ground, stop hammering, connect piles, and repeat the same steps until the design depth is reached. If it is found that the pile position is not correct or inclined at the beginning, adjust or pull out the steel pipe pile and insert it again.

4. After laying the piles, pay attention to stacking the steel piles according to the specifications, and plug the fulcrums with wooden blocks on both sides of the sleepers to prevent deformation.

In the process of steel pipe pile construction, the difficulty is to control the depth and strength of the steel pipe pile, because the depth of the steel pipe pile is mainly controlled by measuring the length of the steel pipe. If the depth of the steel pipe pile cannot be well controlled, then It is easy to cause inaccurate measurement data during the measurement, so the construction personnel will randomly check several steel pipe piles after inserting them, and select one of them as a standard to carry out the inspection of other steel pipe piles. depth. At the same time, everyone should pay attention to construction safety at all times during construction to ensure the normal progress of construction.